/ 4
Fatal error: Could not extract sufficient width/height of the gallery container. Traced measures: width:1264px, height: 19px.

Update Silver Tower

Do you notice the difference between now and one month ago?
The prefab structure has risen to the 5th floor. The production of the façade has started and soon the first façade elements will be installed.
Top